• 25m Arch Installation Trolley with Dual Diesel Electric Power
25m Arch Installation Trolley with Dual Diesel Electric Power

25m Arch Installation Trolley with Dual Diesel Electric Power

Product Details:

Place of Origin: CHINA
Brand Name: POTENTIAL / POTENCY
Certification: ISO9001:2015
Model Number: KGM12300CSG

Payment & Shipping Terms:

Minimum Order Quantity: 1 Unit
Price: Negotiable
Packaging Details: FR or Bulk Ship
Delivery Time: 45 working days
Payment Terms: T/T, L/C
Supply Ability: 120 units per year
Get Best Price Contact Now

Detail Information

Transportation Dimension (L X W X H): 9200×2600×3500mm Min.Operating Width: 5m
Model: Arch Installation Robot KGM12300CSG Dual Power: Diesel & Electric
Ground Cleareace: 450mm Maximum Load-bearing Capacity Of The Main Arm: 3000Kg
Max.Operating Width: 25m Maximum Load-bearing Capacity Of The Auxiliary Arm: 1500Kg
Highlight:

25m arch installation trolley

,

dual power arch trolley

,

diesel electric installation trolley

Product Description

Max.Operating Width 25m Arch Installation Cart for Maximum Ground Clearance and Efficiency
Attribute Value
Transportation Dimension (L X W X H) 9200×2600×3500mm
Min.Operating Width 5m
Model Arch Installation Robot KGM12300CSG
Dual Power Diesel & Electric
Ground Clearance 450mm
Maximum Load-bearing Capacity of The Main Arm 3000Kg
Max.Operating Width 25m
Maximum Load-bearing Capacity of The Auxiliary Arm 1500Kg
Product Description

Dual Power System Innovation
Adopting a hybrid design of diesel and electric power, the diesel engine provides high-intensity operation power in the tunnel (according to the National III emission standard), while the electric motor (IE3 high-efficiency three-phase asynchronous) meets the construction needs of urban areas or enclosed spaces with low noise and zero emissions. The power switching response time is less than 30 seconds.

The dual power redundancy design ensures that the equipment can maintain 50% of its basic operational capacity in the event of a single system failure, significantly improving the continuity of tunnel construction.

Breakthrough in Plateau Adaptability
By using turbocharging matching and ECU high-altitude calibration technology, the rated power output can be maintained at an altitude of 4500 meters and in extreme environments ranging from -25 ℃ to 50 ℃, with a power attenuation rate of less than 8% (industry average of 15%).

The hydraulic system is equipped with a constant power control and oil temperature adaptive adjustment module to solve the problem of starting at low temperatures on high altitudes.

Intelligent Homework System
Integrate CAN bus control system to achieve pre-programming of arm movement trajectory, collision warning, and automatic obstacle avoidance functions. The remote monitoring platform can view equipment operating parameters in real time, generate 3D construction logs, and support big data analysis of over excavation and under excavation.

Safety and Humanized Design
Multi-protection system: The patented folding protective shield (CN222879688U) can be unfolded within 0.5 seconds to form a 2.5m² anti-rockfall area. Mechanical arm hydraulic locking + electrical interlock dual safety prevents fixture failure caused by sudden oil pipe rupture.

Human Machine Engineering Optimization: Wireless remote control with a radius of up to 50 meters allows operators to stay away from dangerous areas on the palm face. The centralized lubrication system reduces maintenance time by 60% and is equipped with a high-altitude oxygen cabin type cab.

Features

Urban Underground Space
Revolutionizing urban infrastructure, the implementation of power mode technology in the development of Shenzhen Metro Line 14 has been a game-changer. Notably, noise levels have been effectively controlled, maintaining levels below 65dB during construction. This achievement not only ensures efficient progress but also ensures compliance with stringent environmental protection regulations, specifically for nighttime construction activities.

Emergency Rescue Scenario
An exemplary use case of innovative technology can be seen in the 2024 Gansu tunnel collapse accident. The incorporation of a dual power system proved to be a life-saving feature, providing 72 hours of continuous and uninterrupted support operation. This demonstrates the critical role modern engineering solutions play in enhancing emergency response capabilities and safeguarding lives.

Technical Parameters
Dual Power: Diesel & Electric
Model: Arch Installation Robot KGM12300CSG
Ground Clearance: 450mm
Transportation Dimension (L X W X H): 9200×2600×3500mm
Maximum Load-bearing Capacity of The Main Arm: 3000Kg
Maximum Load-bearing Capacity of The Auxiliary Arm: 1500Kg
Max. Operating Width: 25m
Min. Operating Width: 5m
Applications

When it comes to the installation of arches in tunnels and similar structures, the Arch Installation Trolley by POTENTIAL (Model: KGM12300CSG) is an indispensable tool. Designed and manufactured in CHINA, this product holds the prestigious ISO9001:2015 certification, ensuring high quality and reliability.

The Arch Installation Trolley serves a variety of product application occasions and scenarios, making it a versatile and essential piece of equipment in construction projects. Its minimum order quantity of 1 unit, negotiable price, and flexible packaging details (FR or Bulk Ship) cater to the needs of both small-scale and large-scale projects.

With a delivery time of 45 working days and payment terms of T/T or L/C, the Arch Installation Trolley offers convenience and efficiency to its customers. Its supply ability of 120 units per year ensures a steady availability of this crucial equipment.

Equipped with a Model Number KGM12300CSG, the Arch Installation Trolley boasts impressive specifications such as a Max. Operating Width of 25m and a Min. Operating Width of 5m. The maximum load-bearing capacity of the auxiliary arm is an impressive 1500Kg, making it suitable for heavy-duty tasks.

The Arch Installation Trolley, also known as the Arch Installation Cart or Arch Installation Carrier, is specifically designed for arch assembly in tunnels. Its ground clearance of 450mm allows for smooth navigation over various terrains, ensuring efficiency and precision in the installation process.

Customization
Brand Name: POTENTIAL / POTENCY
Model Number: KGM12300CSG
Place of Origin: CHINA
Certification: ISO9001:2015
Minimum Order Quantity: 1 Unit
Price: Negotiable
Packaging Details: FR or Bulk Ship
Delivery Time: 45 working days
Packing and Shipping

Product Packaging and Shipping for Arch Installation Trolley:

The Arch Installation Trolley is carefully packaged to ensure safe delivery to our customers. Each trolley is securely wrapped and placed in a sturdy cardboard box to prevent damage during transit.

Shipping Method: Standard Ground Shipping
Estimated Delivery Time: 5-7 business days
Shipping Cost: $20.00

Want to Know more details about this product
I am interested in 25m Arch Installation Trolley with Dual Diesel Electric Power could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.