Dual Power Arch Installation Trolley 5-25m Width 3000kg Capacity
Product Details:
Place of Origin: | CHINA |
Brand Name: | POTENTIAL / POTENCY |
Certification: | ISO9001:2015 |
Model Number: | KGM12300CSG |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 Unit |
---|---|
Price: | Negotiable |
Packaging Details: | FR or Bulk Ship |
Delivery Time: | 45 working days |
Payment Terms: | T/T, L/C |
Supply Ability: | 120 units per year |
Detail Information |
|||
Min.Operating Width: | 5m | Transportation Dimension (L X W X H): | 9200×2600×3500mm |
---|---|---|---|
Dual Power: | Diesel & Electric | Ground Cleareace: | 450mm |
Maximum Load-bearing Capacity Of The Main Arm: | 3000Kg | Max.Operating Width: | 25m |
Maximum Load-bearing Capacity Of The Auxiliary Arm: | 1500Kg | Model: | Arch Installation Robot KGM12300CSG |
Highlight: | Dual power arch installation trolley,3000kg capacity arch trolley,5-25m width installation trolley |
Product Description
Attribute | Value |
---|---|
Min.Operating Width | 5m |
Transportation Dimension (L × W × H) | 9200×2600×3500mm |
Dual Power | Diesel & Electric |
Ground Clearance | 450mm |
Maximum Load-bearing Capacity of The Main Arm | 3000Kg |
Max.Operating Width | 25m |
Maximum Load-bearing Capacity of The Auxiliary Arm | 1500Kg |
Model | Arch Installation Robot KGM12300CSG |
The Arch Installation Carrier features dual power system innovation with a hybrid design of diesel and electric power. The diesel engine provides high-intensity operation power in tunnels (National III emission standard compliant), while the electric motor (IE3 high-efficiency three-phase asynchronous) meets construction needs in urban areas or enclosed spaces with low noise and zero emissions.
Key Advantages:
- Power switching response time less than 30 seconds
- Dual power redundancy maintains 50% operational capacity during single system failure
- Plateau adaptability maintains rated power output at 4500 meters altitude
- Operates in extreme environments from -25℃ to 50℃ with power attenuation rate less than 8%
The hydraulic system features constant power control and oil temperature adaptive adjustment for reliable low-temperature starts at high altitudes. The folding+telescopic three-arm structure supports synchronous construction of full section/two step/three step methods, enabling installation of up to 6 high-speed railway double track tunnel arches per shift.
- 7-degree-of-freedom robotic arm with millimeter-level laser positioning system (±3mm accuracy)
- Patented folding protective shield (CN222879688U) creates 2.5m² anti-rockfall area in 0.5 seconds
- Mechanical arm hydraulic locking + electrical interlock dual safety system
- Wireless remote control with 50m radius operation capability
- Centralized lubrication system reduces maintenance time by 60%
- High-altitude oxygen cabin type cab for operator safety
Enabled continuous operation at 4300 meters altitude in Sichuan-Tibet Railway project, achieving 15% ahead of schedule monthly progress
During 2024 Gansu tunnel collapse, dual power system ensured 72 hours of uninterrupted support operation
- Brand: POTENTIAL/POTENCY
- Model: KGM12300CSG
- Certification: ISO9001:2015
- Minimum Order Quantity: 1 Unit
- Delivery Time: 45 working days
- Annual Supply Capacity: 120 units