Inner 3.0/Outer 7.5 Arch Assembly Machine for Tunnel Maximum Load-bearing Capacity of The Auxiliary Arm 2000Kg
Product Details:
Place of Origin: | CHINA |
Brand Name: | POTENTIAL / POTENCY |
Certification: | ISO9001:2015 |
Model Number: | KGM12200SG |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 Unit |
---|---|
Price: | Negotiable |
Packaging Details: | FR or Bulk Ship |
Delivery Time: | 45 working days |
Payment Terms: | T/T, L/C |
Supply Ability: | 120 units per year |
Detail Information |
|||
Dual Power: | Diesel & Electric | Total Weight: | 29t |
---|---|---|---|
Max.Operating Width: | 15m | Min.Operating Width: | 12m |
Maximum Load-bearing Capacity Of The Auxiliary Arm: | 2000Kg | Model: | Arch Installation Robot KGM12200SG |
Minimum Turning Radius: | Inner 3.0/Outer 7.5 | Transportation Dimension (L X W X H): | 11000×2800×4300mm |
Highlight: | tunnel arch assembly machine,arch installation trolley with 2000kg capacity,7.5 outer arch assembly machine |
Product Description
Product Description:
The KGM12200GS plateau type three folding arm arch frame trolley is a high-performance specialized equipment developed by Changsha Keda Intelligent Equipment Co., Ltd. This trolley is designed for use in high-altitude, low oxygen environment, and complex geological tunnel construction projects. It integrates mechanical, electro-hydraulic, and intelligent control technologies, making it suitable for arch installation operations in railway, highway, water conservancy tunnels, and other engineering projects, especially those requiring the three-step method.
The trolley features a folding arm structure consisting of a first stage arm, a second stage arm, and a third stage arm. The arms are linked by hydraulic cylinders, providing a wide range of deployment and high flexibility. This design allows for multi-angle and multi-posture arch positioning in narrow spaces.
Equipped with a high-altitude dedicated engine and hydraulic system, the trolley can operate stably in low temperature and low oxygen environments above 3500 meters. The hydraulic system uses low-temperature anticoagulant hydraulic oil and intelligent temperature control module to ensure smooth operation in extreme conditions.
The trolley features an integrated PID control algorithm and real-time feedback of boom posture through tilt sensors. The control system adopts an electronic control handle and a user-friendly interface, supporting manual, semi-automatic, and fully automatic modes to reduce operational difficulty and labor intensity.
Equipped with a patented protective shield descent system, the trolley can quickly deploy the shield and activate the descent device in case of rockfall, ensuring safe evacuation. It also features arm collision warning, overload protection, and attitude limit safeguards for enhanced security.
Features:
Adapt to multi-stage segmented construction
In the construction of the three-step method, the tunnel is excavated in three steps: upper, middle, and lower. The three folding arms of KGM12200GS can operate independently at different step heights:
Step up: After the arm frame is deployed, it can reach the arch top and accurately locate the arch frame;
Middle and lower steps: The folding arm can be adjusted horizontally or diagonally to avoid interference from step slopes and achieve installation of side wall arches.
The equipment can quickly move between steps and operate in parallel with excavation and slag removal processes, reducing the construction period.
High synergy with the three-step method
Match the equipment operation rhythm with the three step excavation cycle:
After excavating the upper steps, quickly install the arch frame;
When following up on the middle and lower steps, synchronize the side wall support;
During the construction phase of the inverted arch, the arm frame is retracted to make way for space and avoid equipment occupation.
Support joint operation with self-propelled inverted arch wharf to achieve support closure lining flow construction.
Ability to deal with adverse geological conditions
Three step construction often encounters fractured surrounding rock or fault zones, and the equipment is equipped with:
Rapid support capability: Shorten the exposure time of surrounding rock and control deformation;
Advanced geological adaptation: It can be linked with TSP, geological radar and other prediction systems to adjust support strategies.
Technical Parameters:
Maximum Load-bearing Capacity of The Auxiliary Arm | 2000Kg |
Minimum Turning Radius | Inner 3.0/Outer 7.5 |
Transportation Dimension (L X W X H) | 11000×2800×4300mm |
Dual Power | Diesel & Electric |
Min. Operating Width | 12m |
Model | Arch Installation Robot KGM12200SG |
Total Weight | 29t |
Max. Operating Width | 15m |
Applications:
The KGM12200GS plateau type three folding arm arch trolley is designed to meet the efficiency, accuracy, and safety needs of three-step construction. This is achieved through its intelligent control system, multi-level arm flexibility, and specific plateau design.
Specifically engineered for complex projects like western plateau tunnels and railway deep buried tunnels, this trolley has been successfully utilized in various national key tunnel projects. It has quickly become a benchmark product for enhancing the mechanization level of tunnel construction.
Support and Services:
Our Product Technical Support team is dedicated to assisting you with any questions or issues you may have regarding the Arch Installation Trolley product. Whether you need help with assembly, troubleshooting, or maintenance, our team is here to provide you with the necessary support.
In addition to technical support, we also offer a range of services to ensure that your Arch Installation Trolley product meets your needs and expectations. Our services include product training, on-site installation assistance, and maintenance programs to help prolong the lifespan of your trolley.
Packing and Shipping:
Product Packaging for Arch Installation Trolley:
- The trolley will be securely packed in a cardboard box with foam padding to prevent damage during transit.
Shipping Information:
- The product will be shipped via standard ground shipping and should arrive within 5-7 business days.
- A tracking number will be provided once the order has been processed.