Drilling Anchoring Grouting Equipment

Drilling Anchoring Grouting Equipment
December 27, 2024
Brief: Discover the KMZ611 2500l/h Drilling Anchoring Grouting Equipment, a versatile solution for underground hydropower engineering. With a max operating height of 11m and grouting pressure of 4MPa, this equipment integrates hydraulic rock drilling, anchor rod installation, and grouting for efficient construction processes.
Related Product Features:
  • Four-wheel drive and four-wheel steering chassis ensures excellent maneuverability.
  • Dual power system (diesel and electric) for high efficiency in various conditions.
  • Controller-based system with large screen display for easy operation and monitoring.
  • Intelligent arm control system enhances precision and reduces manual labor.
  • Main arm includes hydraulic rock drilling, grouting, and anchor rod installation systems.
  • Auxiliary arm features a high-altitude work platform and hydraulic robotic arm.
  • Maximum grouting flow rate of 2500l/h for high-performance operations.
  • Compact transport dimensions (13200x2500x3450mm) for easy mobility.
Faqs:
  • What industries can benefit from the KMZ611 Drilling Anchoring Grouting Equipment?
    The KMZ611 is ideal for tunnel support in water diversion projects, railways, highways, deep foundation pits in high-rise buildings, and underground hydropower plants.
  • What are the power options for the KMZ611 equipment?
    The KMZ611 features a dual power system with both diesel and electric options, ensuring high efficiency and adaptability to different operational conditions.
  • What is the maximum working height of the KMZ611 equipment?
    The KMZ611 has a maximum working height of 11 meters, making it suitable for high-altitude support operations in various construction scenarios.
Related Videos

Drilling Anchoring Grouting Equipment KMZ5012 Process

Drilling Anchoring Grouting Equipment
June 10, 2025

Drilling Anchoring Grouting Equipment KMS810

Drilling Anchoring Grouting Equipment
May 13, 2025

Arch Installation Trolley

Arch Installation Trolley
December 26, 2024

Robotic Shotcrete Machine KC2008J

Robotic Shotcrete Machine
December 19, 2024

Concrete Placing Boom Potency

Concrete Placing Boom
March 21, 2025

Concrete Pump

Concrete Placing Boom
February 13, 2025

Concrete Placing Boom

Concrete Placing Boom
December 19, 2024

Robotic Shotcrete Machine Mining KC2008J

Robotic Shotcrete Machine
March 21, 2025